
The place is located in the low of two housing buildings built in 1966 In the plain, neighborhood that forms the district of the same name in the municipality of Gijón.
The main access is done through Alonso Ojeda Street, that runs perpendicular to Pérez de Ayala street, Very close to the Fernández Vallín Secondary Education Institutes; Jovellanos and Mrs. Jimena.
Secondary and accessible access without architectural barriers, It is projected through the service alley that separates the buildings of the aforementioned IES Fernández Vallín. This access is restricted to users of garages and premises located in it, So you can consider added value.
The reform project of this place, intends to keep the main facade existing on Alonso Ojeda Street and adapt the facade after the needs of teaching, opening natural lighting holes for classrooms and access without architectural barriers.
According to the property transmitted needs program, The main use of the premises is the teacher.
Access will occur on both facades, creating a straight axis that divides the place into two parts:
- On one side, as accessed by the main facade (Alonso Ojeda Street), reception zone, dispatches, meeting room and the classroom 2 of computer science.
- On the other side, classroom 1, Central Office Zone, cleaning and toilets and finally the classroom 3.
With this distribution, From a central axis of communication, It is possible to simplify and facilitate evacuation routes. Besides, introducing a new pedestrian access through the service alley, a fully accessible circulation is achieved throughout the premises.
At the main entrance, Administration and Management Stays are located, delimited with screens favoring the permeability of spaces.
On the other hand, The three classrooms have been placed on both facades, To obtain natural light and create healthy spaces, since it is demonstrated that natural light, generates positive effects on students' learning, greater concentration and disease prevention.
In the central area of the premises, Wet premises are projected. A Office equipped to serve lunches, The toilets, including an accessible one complying with the accessibility required by current regulations and cleaning room.


commercial
Mavi Center Training
-
Location Gijon (Asturias), Space
-
Surface 295 M2
-
State Built work
-
Customer Private
-
Date 2024